1、Data Center Commissioning and Considerations for Direct Liquid Cooled SolutionsData Center Commissioning and Considerations for Direct Liquid Cooled SolutionsJerrod ButerbaughPrincipal Engineer/AMDCOOLING ENVIRONMENTSJerrod ButerbaughPrincipal Engineer/AMDData Center Commissioning and Considerations

2、 for Direct Liquid Cooled SolutionsCOOLING ENVIRONMENTSOutline(Optional)54321Design Considerations and CommissioningFWS and CDU Integration and Commissioning SFN/TCS Design and Commissioning DLC ITE Integration and CommissioningCall to ActionDesign Considerations and CommissioningDesign and commissi

3、oning requires comprehensive understanding of the Facility,site specific FWS,TCS,and ITE thermal characteristics/behaviorCommunication with the facility engineers is critical for understanding facility limitations/constraintsIT Engineers and Facility often have different viewsThe CDU solution is dic

4、tated by ITE solution requirements,facility constraints and/or operational goalsEach customer is uniqueCourtesy ASHRAE TC9.9 2019-Water-Cooled Servers Common Designs,Components,and Processes FWS and CDU Integration and Commissioning Provides isolation for each tenant and for each floor of a multi-st

5、ory data centerAllows for concurrent maintenance Facility Electrical and FWS design impacts commissioning activities of CDUElectrical integration of CDUPre-power on electrical pull tests,Power validation and fault testingPower redundancy testingFWS integration of CDUPressure testingFilling/bleeding

6、CDU primary(for L2L CDU)Balancing facility flow and validating required flow is achievable(for L2L CDU)CDU primary pressure drop,FWS pressure dropIndependent thermal load testing with SFN integration(if required)load banksEntire solution validation with SFN/TCS and DLC ITE integrationFWS and CDU per

word格式文档无特别注明外均可编辑修改,预览文件经过压缩,下载原文更清晰!
三个皮匠报告文库所有资源均是客户上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作商用。
根据报告的内容,全文主要围绕数据中心液冷解决方案的安装和调试展开。以下是关键点: 1. 设计与调试需全面理解设施、现场特定设施、TCS和ITE的热特性/行为。 2. 与设施工程师的沟通对于理解设施限制/约束至关重要。 3. IT工程师和设施工程师可能有不同的观点。 4. CDU解决方案由ITE解决方案要求、设施限制和/或运营目标决定。 5. FWS和CDU集成与调试包括电气集成、压力测试、平衡设施流量等。 6. SFN/TCS设计与调试基于模块化构建块,简化部署并实现多供应商供应链。 7. DLC ITE与CDU集成涉及流体选择、兼容性、制造测试过程和压力测试。 8. 文档和资源链接提供进一步信息。
液冷方案揭秘" 关键步骤解析" 设计到部署全攻略"
客服
商务合作
小程序
服务号
折叠