1、PV ModuleTech EU 2025BESS manufacturing defect overviewGeorge TouloupasVP,ESG and New ServicesINTERTEK CEA HAS CONDUCTED QUALITY AUDITS ON OVER 65 GWH OF LITHIUM-ION BATTERY ENERGY STORAGE PROJECTS SINCE 2018Copyright 2025 Intertek CEA2700+inspections in 70+BESS factories70%of tier 1*BESS cell manuf

2、acturers audited worldwide 3000+total manufacturing issues identified*Tier 1:definition is based on BMI(Benchmark Mineral Intelligence)USAChinaIndiaVietnamSouth KoreaHere are our key findings from our 2024 inspections.Locations of factory auditsIN 2024 THE MAJORITY OF IDENTIFIED QUALITY ISSUES WERE

3、AT THE SYSTEM LEVELSYSTEM-LEVEL DEFECTS ACCOUNTED FOR 72%OF ALL DEFECTS IDENTIFIED IN 2024,UP FROM 48%.MANY OF THESE DEFECTS POSE SERIOUS RISKS TO BESS SAFETY,RELIABILITY,AND PERFORMANCE.Copyright 2025 Intertek CEA330%23%48%15%13%72%0%10%20%30%40%50%60%70%80%Cell-level defectsModule-level defectsSys

4、tem-level defectsShare of QA Findings by Manufacturing StagePrevious Years202428%of systems had defects in fire detection and suppression,which are critical for preventing runaway fires.19%of systems had faulty auxiliary circuit panels,increasing the risk of control system failure.15%of systems had

5、thermal management defects,raising the risk of overheating and accelerated degradation.6%of systems failed capacity tests directly impacting energy delivery and project performance.Safety-critical failures:Performance failures:System-level defectsDistribution of Total Findings4The large number of sy

6、stem-level issues is mainly caused by the following contributors:The BESS integration process is highly manual and labor-intensive,with weaker quality control often carried out by outsourced integration companies who have little incentive to ensure long-term performance.The rapid product iteration p

word格式文档无特别注明外均可编辑修改,预览文件经过压缩,下载原文更清晰!
三个皮匠报告文库所有资源均是客户上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作商用。
根据《Data》标记中的内容,全文主要内容概括如下: - **BESS制造缺陷概述**:Intertek CEA自2018年以来对超过65 GWh的锂离子电池储能项目进行了质量审计,发现系统级缺陷占2024年所有缺陷的72%。 - **关键发现**: - 系统级缺陷:占所有缺陷的72%,主要原因是BESS集成过程高度手动,质量控制薄弱,以及产品快速迭代导致的时间限制。 - 细分缺陷:包括外壳制造缺陷(30%)、平衡系统相关缺陷(64%)和性能测试相关缺陷(6%)。 - 安全关键故障:28%的系统存在火灾检测和抑制系统缺陷,15%的系统存在辅助电路面板故障,6%的系统容量测试失败。 - **挑战**:电池制造商对上游供应链的控制不如光伏行业,且BESS电池制造商难以满足欧盟电池法规的要求。 - **进展**:随着大型买家对ESG要求的严格,BESS供应商竞争激烈,要求透明度。
系统级问题占比高达72%?" 系统级缺陷如何影响性能?" 欧盟新规下的透明度与可追溯性"
客服
商务合作
小程序
服务号
折叠