当前位置:首页 > 报告详情

泡沫沥青稳定路面基层.pdf

上传人: 海*** 编号:184581 2024-11-10 16页 1.75MB

1、MP 1235-1252 RehabilitationA L A SK A HIG HW A YFoamed A sphalt Stabilized Base C ourse(FA SBC)Jacob Temple,D O T&PF Project E ngineerTodd Brownson,HC C ontractors1FO A ME D A SPHA L T IN NR D O T&PFFor Northern Region(NR)Rehab/Resurfacing projects,C rushed A sphalt Base C ourse(C A BC)is typical.Th

2、e last time F A SBC was done in NR was in 2005(Parks Hwy 325-351 Rehab)The largest and northernmost foamingproject in the U.S.at this point.2 Substandard Base&Subbase material with up to 12%of fines.V arying paving products encountered(Hot mix,chip seal,High float).Permafrost and ice rich material(s

3、and)susceptible to seasonal frost.D istressed pavement,potholing,excessive patching,and settlement.W HY FO A ME D A SPHA L T O N THIS PRO JE C T?Per G eotechnical Report&D esign Study Report:3FA SBC W A S SE L E C TE D RA THE R THA N C A BC TO IMPRO V E:The material properties of the base course lay

4、er.Bind excess fines to improve freeze thaw performance of the base layer.4THRE E PRO PO SE D G RA D A TIO NS&MIX D E SIG NS D ue to varying paving products and thicknesses in the existing pavement and base,several mix designs were proposed.Foaming O il Temperature:329 F This project utilized MD-3.5

5、FO A ME D A SPHA L T PRO C E SSPhase 2-Steps1.Spread C ement on C A BC grade&foam 6”of C A BC.2.G rade FA SBC to the base course finish grade.Phase 1-Steps1.Reclaim 6”of existing pavement and base course.2.L evel adjust C A BC grade to base course finish grade.3.Use C A BC material for shouldering t

6、he pavement.4.Import A BC E-1 where C A BC material is depleted.6Foamed A sphalt ProcessPhase 1-C A BC1.Reclamation2.W aterPhase 2-FA SBC1.A sphalt C ement(2%)-329 F2.Portland C ement(1%)3.W ater(3%)7Foamed A sphalt Basic E quipmentO il Storage TankerC ement D istributor TruckC e

word格式文档无特别注明外均可编辑修改,预览文件经过压缩,下载原文更清晰!
三个皮匠报告文库所有资源均是客户上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作商用。
本文主要介绍了美国阿拉斯加州北部地区(NR)的一项道路修复项目,该项目采用了泡沫沥青稳定基层(Foamed Asphalt Stabilized Base Course,简称FASBC)技术。该项目是迄今为止美国最北端的大型泡沫沥青项目。文章详细描述了项目施工的各个阶段,包括现有路面和基层的回收、使用水泥和泡沫沥青的混合物进行基层改善,以及最终的沥青铺设。研究指出,与传统的碎石沥青基层(CABC)相比,FASBC能提高基层材料的性能,并增强其抗冻性能。项目面临的问题包括基层和底层材料的不标准、多样的路面产品、永冻土和冰冻沙土等。施工过程中使用的关键设备包括水泥分配车、泡沫沥青处理器、振动羊足压路机、 motor grader 和双鼓式压路机等。最后,文章提供了施工过程中的关键数据和操作步骤,并通过图片展示了施工的不同阶段。
"Foamed Asphalt Stabilized Base Course (FASBC)如何工作?" "为什么这个项目选择使用泡沫沥青而不是碎石沥青?" "如何进行泡沫沥青的施工过程?"
客服
商务合作
小程序
服务号
折叠