1、March 2020 LONG TERM GENERATION EXPANSION PLAN 2020-2039(DRAFT)CEYLON ELECTRICITY BOARD Transmission and Generation Planning Branch Transmission Division Ceylon Electricity Board Sri Lanka March 2020 Long Term Generation Expansion Planning Studies 2020-2039 Compiled and prepared by The Generation Pl
2、anning Unit Transmission and Generation Planning Branch Ceylon Electricity Board,Sri Lanka Long-term generation expansion planning studies are carried out every two years by the Transmission&Generation Planning Branch of the Ceylon Electricity Board,Sri Lanka and this report is a biennial publicatio
3、n based on the results of the latest expansion planning studies.The data used in this study and the results of the study,which are published in this report,are intended purely for this purpose.Price Rs.4000.00 Ceylon Electricity Board,Sri Lanka,2020 Note:Extracts from this book should not be reprodu
4、ced without the approval of General Manager CEB Foreword The Report on Long Term Generation Expansion Planning Studies 2020-2039,presents the results of the latest expansion planning studies conducted by the Transmission and Generation Planning Branch of the Ceylon Electricity Board for the planning
5、 period 2020-2039,and replaces the Long Term Generation Expansion Plan 2018-2037.This report,gives a comprehensive view of the existing generating system,future electricity demand and future power generation options in addition to the expansion study results.The latest available data were used in th
6、e study.The Planning Team wishes to express their gratitude to all those who have assisted in preparing the report.We would welcome suggestions,comments and criticism for the improvement of this publication.March 2020.Transmission and Generation Planning Branch Letters:5th Floor,Head Office Bldg.Tr.