1、LONG TERMGENERATIONEXPANSIONPLAN2022-2041CEYLON ELECTRICITY BOARD LONG TERM GENERATION EXPANSION PLAN 2022-2041 CEYLON ELECTRICITY BOARD Transmission and Generation Planning Branch Transmission Division Ceylon Electricity Board Sri Lanka October 2021 Long Term Generation Expansion Planning Studies 2
2、022-2041 PUCSL approval granted with conditions in October 2021(Refer Annex 15)Compiled and prepared by The Generation Planning Unit Transmission and Generation Planning Branch Ceylon Electricity Board,Sri Lanka Long-term generation expansion planning studies are carried out every two years by the T
3、ransmission&Generation Planning Branch of the Ceylon Electricity Board,Sri Lanka and this report is a biennial publication based on the results of the latest expansion planning studies.The data used in this study and the results of the study,which are published in this report,are intended purely for
4、 this purpose.Price Rs.4000.00 Ceylon Electricity Board,Sri Lanka,2021 Note:Extracts from this book should not be reproduced without the approval of General Manager CEB Foreword The Report on Long Term Generation Expansion Planning Studies 2022-2041,presents the results of the latest expansion plann
5、ing studies conducted by the Transmission and Generation Planning Branch of the Ceylon Electricity Board for the planning period 2022-2041,and replaces the Long Term Generation Expansion Plan 2018-2037.This report,gives a comprehensive view of the existing generating system,future electricity demand
6、 and future power generation options in addition to the expansion study results.The latest available data were used in the study.The Planning Team wishes to express their gratitude to all those who have assisted in preparing the report.We would welcome suggestions,comments and criticism for the impr