1、 LONG TERM GENERATION EXPANSION PLAN 2018-2037 CEYLON ELECTRICITY BOARD Transmission and Generation Planning Branch Transmission Division Ceylon Electricity Board Sri Lanka June 2018 LONG TERM GENERATION EXPANSION PLAN 2018-2037 CEYLON ELECTRICITY BOARD Transmission and Generation Planning Branch Tr
2、ansmission Division Ceylon Electricity Board Sri Lanka June 2018 Submitted to PUCSL for approval on 05th May 2017,PUCSL approval granted on 12th June 2018 Long Term Generation Expansion Planning Studies 2018-2037 Submitted to PUCSL for approval on 05th May 2017 PUCSL approval granted on 12th June 20
3、18 Compiled and prepared by The Generation Planning Unit Transmission and Generation Planning Branch Ceylon Electricity Board,Sri Lanka Long-term generation expansion planning studies are carried out every two years by the Transmission&Generation Planning Branch of the Ceylon Electricity Board,Sri L
4、anka and this report is a biennial publication based on the results of the latest expansion planning studies.The data used in this study and the results of the study,which are published in this report,are intended purely for this purpose.Price Rs.4000.00 Ceylon Electricity Board,Sri Lanka,2018 Note:
5、Extracts from this book should not be reproduced without the approval of General Manager CEB Foreword The Report on Long Term Generation Expansion Planning Studies 2018-2037,presents the results of the latest expansion planning studies conducted by the Transmission and Generation Planning Branch of
6、the Ceylon Electricity Board for the planning period 2018-2037,and replaces the Long Term Generation Expansion Plan 2015-2034.This report,gives a comprehensive view of the existing generating system,future electricity demand and future power generation options in addition to the expansion study resu